Work recently completed by our multi-talented road department

Update from our Borough Secretary/Treasurer:

Attached please find photos of work recently completed by our multi-talented road department.

In the first photo – our part time groundskeeper, Ron, painted the pavilion behind the borough building a “brick red” to match the shed. In my opinion, this color looks a lot better than the bright green! The pavilion needs another coat, which will be done once we have a break in the weather.

The second photo shows the radon mitigation system installed by our road employees.

Photos of Pavillion – Painted Red (1)
Photos of Radon Mitigation System – Installed October 2018 (1)